You get the flag on a Tuesday: a patch of scrub off the B-road that wasn't there last quarter. Before anyone signs out a vehicle, someone has to answer the boring but expensive question. Is this a transit van's worth of garden waste, or three grab lorry loads of mixed construction rubble? Get it wrong and you've either sent a crew that can't finish the job, or booked a tipper and two labourers for a pile you could have cleared with a trailer.
Aerial imagery won't give you an exact cubic metre figure. Nobody's software will, not from RGB alone. But it gets you close enough to size the job properly, and that's the point: a sensible first guess beats a wasted trip every time.
Start with footprint, not volume
The one thing very-high-resolution imagery measures well is area. At 0.5 m ground sample distance, a tipped load that spans even a modest patch of verge covers enough pixels to trace a reliable outline. Draw the polygon around the tip, let it calculate square metres, and you've got your starting number.
This is also where comparing against the last sweep earns its keep. If the same patch of ground showed bare verge three months ago and now shows a 40 m² footprint, that's a dump that's grown fast enough to matter. A tip that's been sitting at the same footprint for a year is a different enforcement priority than one that doubled since last quarter.
Depth is the part nobody can skip
Footprint tells you how much ground it covers. It says nothing about how deep the pile is, and that's where RGB imagery runs out of road. No thermal, no LiDAR, no way to read a contractor's rubble heap at 1.2 m versus a scatter of garden cuttings at 20 cm from the pixels alone.
What you can do is read the shadow. On a clear capture, a pile's shadow length, combined with the sun angle at time of capture, gives a rough height cue, enough to tell a low scatter from a proper mound. It won't survive cross-examination as a measurement, but it's enough to tell you if this is van work or tipper work.
The other input is plain field knowledge: what does a typical skip-load footprint of mixed trade waste actually look like on the ground, versus a job lot of tyres, versus a flytip of soil and hardcore from a driveway job. Most enforcement teams already carry that mental conversion from years of site visits. Pair it with the footprint number from imagery and you've got a working estimate, close enough to brief a crew.
Sizing the job before anyone drives out
Multiply footprint by your best-guess depth and you've got a rough cubic metre figure. From there the dispatch decision gets simple: under a few cubic metres, a single skip or a grab lorry run covers it. Once you're estimating double digits, you're looking at multiple loads, possibly a tipper with a loading shovel, and a crew big enough to do it in one visit rather than two.
That estimate also feeds the paperwork that follows, the Duty of Care notice to the landowner, the budget line for clearance, the decision on whether this one's worth chasing for a prosecution or just scheduling for removal. Getting the scale roughly right before the van leaves the depot saves the second trip nobody budgeted for.
None of this replaces eyes on the ground. A footprint-and-shadow estimate from imagery is a briefing tool, not a quantity surveyor's report. What it changes is which dumps get looked at first and how well-prepared the crew is when they get there. Waste Dump Detection runs that comparison every quarter across verges, quarries and vacant land, flagging what's new and what's grown since the last pass, so the newest tips get picked up before the loudest complaint does.
If you're tired of sizing jobs on a drive-by guess, see how a quarterly sweep changes the order you send crews out in.